Reese Park Pavilion
September 13, 2024
The City of Muskegon is seeking proposals from qualified contractors to construct an outdoor pavilion within Reese Park, 1685 Creston St, Muskegon.
Pavilion requirements are as follows:
• Minimum 800 SFT of floor space
• Minimum 8 FT vertical clearance
• Minimum 10 FT clearance between posts
• Timber Frame construction
• 4” concrete slab extending 1 FT beyond drip line on all sides
• 20A GFCI Electrical Outlets on four (4) of the posts
• Corrugated steel roofing
The proposed location is included in the bidding documents. Bidders shall provide a design specification that meets the above requirements and fits within the proposed approximate location.
Electrical supply is available from the adjacent supply building. Bidder shall be responsible to provide all necessary fixtures and supplies to provide electrical service to the new pavilion from the existing panel within the storage building.
RFP – Reese Park Pavilion
Attachment A – Reese Park Pavilion