2025 Fees
All
Arena
Cemeteries
City-Code Compliance
Clerk
Cns
Dpw
Dpw (Parks)
Engineering
Farmers Market
Farmers Market Kitchen
Finance
Fire
Flea Market
Income Tax
Marina
Planning
Police
Public Safety - Building
Public Safety - Code Enforcement
Public Safety - Env Services
Public Safety - Rental
Special Events
Treasurer
Water Filtration
Water-Sewer
Western Market
Zoning
Engineering User Fees
| Description | Fee | Unit | Comments |
|---|---|---|---|
| Charge For Bid Documents | 40.00 | Each | |
| Charge For Blueprints (Plans & Utility Maps) | 8.00 | Each | |
| Dumpster In Road Or Right Of Way | 25.00 | Each | |
| Encroachment 1-Year Renewal | 25.00 | Each | |
| Encroachment 1-Year Renewal (Inspection Req'd) | 50.00 | Each | |
| Encroachment Permit Application Fee | 100.00 | Each | |
| Encroachment Permit Certificate Fee | 50.00 | Each Location | Same As Renewal Fee |
| Replace/ Install Commercial Driveway In Right Of Way | 50.00 | Each Unit | |
| Replace/ Install Residential Driveway In Right Of Way | 25.00 | Each Unit | Sidewalk/Drive Approaches, Landscaping |
| Replace/ Install Sidewalk In Right Of Way | 25.00 | Each Unit | |
| Right Of Way Permit | 10.00 | Per Unit | Or Actual Costs (Whichever Is Greater) |
| Road Closure (Excluding Special Events) | 25.00 | Each | |
| Storm Sewer Connection Fee | 1,200.00 | Each | Connection Fee Only, Work By Others |
| Storm Water Management Review Fee | 2,000.00 | Each Review | Additional Fees May Apply As Needed |
| Utility Annual Permit Fee | 1,750.00 | Each | |
| Utility Cut (Pavement Removal-Pavement 4-9 Yearsold) | 75.00 | Square Yard | Fees Adjusted To Reflect Residual Value |
| Utility Cut (Pavement Removal-Pavement <4 Yearsold) | 100.00 | Square Yard | Fees Adjusted To Reflect Residual Value |
| Utility Cut (Pavement Removal-Pavement >10 Yearsold) | 50.00 | Square Yard | Fees Adjusted To Reflect Residual Value |
| Utility Cut Permit Fee | 20.00 | Unit | |
| Wide Load Permit | 50.00 | Each |