User Fees

2025 Fees

All Departments


All
Arena
Cemeteries
City-Code Compliance
Clerk
Cns
Dpw
Dpw (Parks)
Engineering
Farmers Market
Farmers Market Kitchen
Finance
Fire
Flea Market
Income Tax
Marina
Planning
Police
Public Safety - Building
Public Safety - Code Enforcement
Public Safety - Env Services
Public Safety - Rental
Special Events
Treasurer
Water Filtration
Water-Sewer
Western Market
Zoning

Engineering User Fees

DescriptionFeeUnitComments
Charge For Bid Documents 40.00 Each
Charge For Blueprints (Plans & Utility Maps) 8.00 Each
Dumpster In Road Or Right Of Way 25.00 Each
Encroachment 1-Year Renewal 25.00 Each
Encroachment 1-Year Renewal (Inspection Req'd) 50.00 Each
Encroachment Permit Application Fee 100.00 Each
Encroachment Permit Certificate Fee 50.00 Each Location Same As Renewal Fee
Replace/ Install Commercial Driveway In Right Of Way 50.00 Each Unit
Replace/ Install Residential Driveway In Right Of Way 25.00 Each Unit Sidewalk/Drive Approaches, Landscaping
Replace/ Install Sidewalk In Right Of Way 25.00 Each Unit
Right Of Way Permit 10.00 Per Unit Or Actual Costs (Whichever Is Greater)
Road Closure (Excluding Special Events) 25.00 Each
Storm Sewer Connection Fee 1,200.00 Each Connection Fee Only, Work By Others
Storm Water Management Review Fee 2,000.00 Each Review Additional Fees May Apply As Needed
Utility Annual Permit Fee 1,750.00 Each
Utility Cut (Pavement Removal-Pavement 4-9 Yearsold) 75.00 Square Yard Fees Adjusted To Reflect Residual Value
Utility Cut (Pavement Removal-Pavement <4 Yearsold) 100.00 Square Yard Fees Adjusted To Reflect Residual Value
Utility Cut (Pavement Removal-Pavement >10 Yearsold) 50.00 Square Yard Fees Adjusted To Reflect Residual Value
Utility Cut Permit Fee 20.00 Unit
Wide Load Permit 50.00 Each
Hey there! Ask me anything!